I removed some in-wall ducting coming from the attic that fed registers on both sides of the wall. I intend on patching up the drywall of course, but before I do I want to block up the hole in the top plate as seen in the photos, and make sure that it is structurally sound. Studs are 16" on center.
Two questions:
- There is existing strapping for the top plate on both sides of the wall, it extends about six inches to either side of the hole in the top plate. Since I don’t know the quality of the fastener used to affix the strapping to the top plate and the condition of the strap itself, should I add additional strapping for structural purposes?
- Of the several locations that I removed this ducting, most don’t have enough top plate exposed between studs to affix blocking to, so it would have to be stud-to-stud, or on top in the attic, but even there the ceiling joists don’t provide much room to connect blocking to. Any recommendations for blocking the hole in the top plate?