I'm trying to figure out the timing of redoing my shower. I'm looking at installing a new tub with a tile surround. I'd like to demo the current setup and install the tub and backerboard (and sealant) one weekend and then do the tiling the next weekend.
Since this is my only shower, can I use the shower after putting up the backerboard and sealing it without yet tiling and not mess up the backerboard?