temporary for 6-8 months for a vending trailer with the wiring running around 100 feet from the pole/meter to the trailer above ground in unglued conduit can they do this in a commercial zone any one help me with this

1 Answers1

0

Only if you can convince the inspector that the wire size is sufficient to carry the expected load safely. And secondly, you will have to convince him that the wire is absolutely protected from any physical damage that the ambient conditions can meet out. I'm pessimistic.